05 January 2022

Pool Construction Process Of La Familia Has Been Completed

Naval Yachts have been making confident steps since the project got to the shipyard. Extensions from both bow and stern parts have been proceeding with proper planning and craftsmanship. On the front part, the extensional structure has been aligned and mounted on the original boat's main deck area with respect to advanced engineering calculations. The total thickness of the composite material that is used to build this structure is 60 millimetres.

This extension's main focal point is its pool part which takes up most of the space. A certain level difference is created with the staircase that goes from back to front inside of the pool. At the deepest part, a person is capable to see outside under the water from the parallel shaped windows that are located on the port and starboard parts of the pool. With the use of corner corridors, a person can reach the front part easily from the both sides of the boat. After the settling process is completed, further detailed works on the pool part have been completed and now it is ready for the painting process.

x

Get in touch

Please leave your contacts so we can get back to you

up
Web Tasarım, Yazılım: Kıvanç Pehlivan